Knightsbridge

Contract Sum:          £750,000.00+

Contract Period:        52 weeks

Works consist of:       

  •     Heavy Duty Cantilevered Gantry
  •     Banner Frame and supply and fix of banner
  •     Independent Tied Access Scaffolds
  •     Heavy Duty Hoist Support Frames
  •     Cantilevered Access and Temporary Roof Support Scaffolds
  •     System Temporary Roof Cover
  •     System Staircases
  •     Internal Ceiling Support Scaffold Shores
  •     Supply and installation of temporary site accommodation units.

 

This is a prestigious project opposite Hyde Park and when complete will form one of the most expensive private dwellings in London.

The installation of the scaffold, temporary roof and site accommodation is near completion. Due to the nature of the refurbishment works and ground conditions this has proved to be one of the most challenging and rewarding contracts we have undertaken. The design process has been intense and has varied considerably during the erection process to suit the ever changing site conditions. The end result is one of the most complex scaffold structures to be built in London.

 

 

 